TileOver System – Ultimate Adhesives Install Guide
Tilemaster adhesives specification for Ultimate |
---|
This specification has been compiled to assist in your project when installing floor finishes onto OMNIE Ultimate. Prior to commencing works, and once the OMNIE Ultimate and heating pipes have been installed, the underfloor heating pipes must be hydraulically pressure tested and checked for leaks. Ensure existing slab/floor deck meets at least SR2 (5mm deviation in 2m) requirements for floor regularity (BS8204) and preferably SR1 (3mm deviation in 2m). NOTE: Any deviations beyond the above will result in the required quantity of Adhesive and Levelflex screed changing. OMNIE cannot be responsible for shortages due to site conditions that don’t meet the recommended floor levels. NOTE: Suspended floor must be completely deflection free.
|