TileOver System – FoilBoard Suspended Tilemaster Adhesives Install Guide
Tilemaster Adhesives Specification |
---|
This specification has been compiled to assist in your project when installing floor finishes onto OMNIE FoilBoard (Suspended System). Prior to commencing works, and once the OMNIE FoilBoard panel and heating pipes have been installed, the underfloor heating pipes must be hydraulically pressure tested and checked for leaks. The floor deck installed over the surface must be minimum 22mm tongue and grooved flooring grade plywood or tongue and grooved green chipboard screwed into the joists at no more than 300mm centres. If using chipboard flooring, the floor should then be over boarded with plywood or cement based tile backer board. Plywood overlay must be 6mm (minimum), flooring grade, screwed (not nailed) to substrate at 150mm centres and glued. Cement based tile backerboard must be 6mm (minimum), screwed (not nailed) to substrate at 300mm centres and glued. The surface should be vacuumed to remove all loose dust, dirt and contaminants and checked to ensure the boards are dry. |
Download Specification
|
![]() |