Discussion Board » Floating floors » First Stage of OMNIE’s Whole House System Installed in Timber Frame House

First Stage of OMNIE’s Whole House System Installed in Timber Frame House


A brand new timber frame house in Flamborough, East Yorkshire has recently seen the installation of LowBoard 15 in six rooms across the first floor. The LowBoard system, covering around 100m² and being supplied by a 12-port manifold, was installed by Paul Scholey of Smart EcoHomes.

The first floor underfloor heating is the first stage of the complete ‘Whole House System’ from OMNIE. Future stages of the project will see ClipPlate underfloor heating installed on the ground floor, an LWD 70A/SX air source heat pump from OMNIE and a CA550 heat recovery unit. The whole system will be controlled by OMNIE’s Network Controls.

Keep checking up on the OMNIE Community for further updates on the project.

  • IMG_0320
  • IMG_0322
  • IMG_0330
  • IMG_0332
  • IMG_0333
  • IMG_0335

Leave a Reply

Your email address will not be published.

Tags

Floating floorsUnderfloor Heating

Users who have favourited this post (1)

 1

Share