ScreedPlate 0 Install Guide – OMNIE Underfloor Heating, Heat Pumps & Ventilation
We - and our partners - use cookies to deliver our services and personalise your experience. By using our website, you agree to the use of cookies as described in our Cookie Policy.
×
Get a Quote
NEW - TorFloor 2
Boiler Upgrade Scheme
Underfloor Heating
Underfloor Heating
Why UFH?
Explore the Range
Floating Floors
Floating Floors
FoilFloat
LowBoard
OMNIE-Tile
Back
Batten Floors
Batten Floors
FoilBatten
TorFloor 2
TorFloor
Back
Suspended Floors
Suspended Floors
FoilBoard
TorFloor 2
TorFloor
Underplate
Back
Screeded Floors
Screeded Floors
ScreedPlate
Staple
Back
Acoustic Floors
Acoustic Floors
New Acoustic Range
TorFloor RdB
LowBoard RdB
FoilFloat RdB
Back
Low Build Up
Low Build Up
LowBoard
Ultimate 2
OMNIE-Tile
Back
Manifolds & Pipe
Manifolds & Pipe
Precision-Flo Manifold
OMNIFLO Pipe
FORMUFLO Pipe
Back
Back
Heat Pumps
Ventilation & Heat Recovery
Smart Controls & Thermostats
Hot & Cold Distribution
System Design
OMNIE for Developers
Technical Library
Technical Library
Datasheets & Guides
Install Videos
FAQs
Back
Case Studies
Get in touch
Book a RIBA CPD Course
About OMNIE
FAQs
Call us today 01392 36 36 05
Home | Resources
ScreedPlate 0 Install Guide
All

ScreedPlate 0 Install Guide

IG UFH 12

Stage 1 - Storage & Floor Preperation

NOTE: If it is necessary to store the system once you have taken delivery, ensure it is kept in the following conditions:

  • A dry, weather tight area
  • Out of direct sunlight
  • Away from sharp objects or chemical spillages

Ensure that the floor slab / sub floor has:

  • an effective damp proof membrane
  • insulation within the slab build-up
  • an even surface*
  • a dust free surface

* Even Surface – Ensure existing slab meets at least SR2 (5mm deviation in 2m) requirements for floor regularity (BS8204) and preferably SR1 (3mm deviation in 2m).

Lay the expansion foam around the perimeter of the room, ensuring the gaiter is facing into the room. The expansion foam should be fitted to the full depth of the floor insulation and screed.

NOTE: Where the expansion foam is installed on external walls, additional insulation will be required for compliance with building regulations.


Stage 2

Lay insulation in accordance with Building Regulation requirements. Insulation should be laid hard up against the expansion foam with no gaps. Ensure that the foams’ gaiter is lying on top of the insulation to prevent the screed from flowing under the insulation.

NOTE: When working with any wood or insulation based products, dust and partials can become airborne and pose a hazard to health. This is particularly relevant when machining, cutting or routing. Please follow the relevant guidelines in the product safety datasheets (available on request) on reducing the risk of dust inhalation.


Stage 3

Starting from one corner, lay the first ScreedPlate panel with the gaiter lying on top.

Lay the second ScreedPlate by interlocking the end strip of castellations into the first sheet.


Stage 4

Continue to lay the interlocking ScreedPlate panels across the floor as per the layout below, trimming the panels where necessary.


Stage 5

Preparation and requirements for specialist screed should be sought from the screed supplier/manufacturer. Depending on the screed type, all joints between panels and around the perimeter of the room may need to be secured/taped to ensure the floor is fully sealed prior to the screed being laid.


Stage 6

Starting at the manifold and referring to the OMNIE CAD design, insert the pipe into the ScreedPlate panels at the appropriate centres. Repeat until all circuits are laid in a snail pattern layout. Ensure bending radius is kept consistent and meets with the requirements of the pipe (see below).

The minimum temperature for laying the pipe should be +5°C.

NOTE: If the pipe work is kinked during the installation, the coil must be replaced or the pipe repaired with an OMNIE connector and then pressure tested. No connections should be made unless fully accessible following the completion of screeding and finished floor.


Stage 7

Once all of the ScreedPlate panels and pipes have been laid, they should be protected with walking boards (especially in areas with high foot traffic).


Stage 8

Hydraulic pressure test each circuit and keep under pressure whilst the screed is being laid.


Quick Guide to Filling the System

1. If the manifold is being used to pressure test all circuits at once, close both primary isolation valves.

2. Connect a pressure tester to the drain valve, vent the system of air and increase the pressure to 6 bar.

3. Once at this pressure, leave for 60 minutes. If the pressure has dropped examine the pipework. It may be necessary to pressure test individual circuits to determine if there has been damage to the pipe.

4. If the pressure is maintained and passes the test, record the results on the pressure test certificate. Have the test witnessed and certified by a third party.

5. Maintain this test pressure whilst the screed is being laid.

SEE MANIFOLD INSTALLATION GUIDE (DOCUMENT CODE: IG UFH 17) FOR FULL INSTRUCTIONS


Notes on Expansion Joints

For heating screeds intended for the application of stone or ceramic coverings, joint areas shall not exceed 40m2 with a maximum length of 8m. In the case of rectangular rooms, joint areas can exceed these dimensions but maximum to the length relation of 2 to 1. If induced contraction joints are placed in heating screed, these may be cut to a depth of not more than one third of the screed thickness taking into account the location of the pipes and shall be sealed after heating up.

Only flow and return pipe should pass through expansion joints. Where this is the case, connecting pipes shall be covered with a flexible insulation tube of some 0.3m in length spanning the expansion joint.


Notes on Screeding

It is advisable to keep the system under pressure when laying the screed at a minimum of 6 bar using water. It is essential that the concrete or screed is allowed to fully cure before the underfloor heating system is first put into operation.

Any operation of the heating system prior to curing will reduce the moisture content of the screed or concrete and may result in failure of the floor. Initial warm up should take place at least 21 days after the cement screed or in accordance with the manufacturer’s instructions. During the initial heat up, the mixing valve should be set to supply temperature between 20°C and 25°C which needs to be maintained for at least 3 days.

After this period, the flow temperature can then be increased to the design maximum and should be held for a further 4 days to complete the process.

PRODUCTS
  • Underfloor Heating
  • Network Controls
  • Heat Pumps
INFORMATION
  • About Us
  • Resources
  • FAQs & Support
  • Terms & conditions
  • Privacy & Cookie Policy
FOLLOW US
  • Twitter
  • Facebook
NEWS & UPDATES

© OMNIE